Design and Supervision of MEP installations for new residential building: “The Palm Tree Apartments” with external pools and parking area on basement, energy class A+ according KENAK. The building covers ~950 sqm, plus landscape areas
Services: HVAC Design, PV’s Design, Potable Water and Irrigation Networks Design, Sewage and Rainwater Drainage Design, Pools MEP installations design, Natural Gas Design, Garage Ventilation Design, Passive and Active Fire Protection Design, Electrical Design for both Power Networks and Low Voltage Networks.
Architect:
Concept Studio
Date:
2020
Construction:
Sunnyland S.A.